More progress on Cherrywood LUAS

Progress continues on the extension of the Green LUAS line from Sandyford to Cherrywood.

Major structures have been in place for at least 18 months, and most tracklaying was done in 2009, but now work is progressing on the overhead electric wiring.  The photos below show the wiring in place at the “Bride’s Glen” stop, in Cherrywood Science & Technology Park, and were taken on Saturday 20th February 2010.

A note: Somewhat confusingly, the “Cherrywood” stop will be in the Tullyvale residential area, while the last stop, actually in the Cherrywood campus, is “Bride’s Glen”.

Much work remains to be done, and I’d estimate empty testing to take place from summer, with an October/November opening date for the line.

Overhead wiring now installed at Bride's Glen terminal stop in Cherrywood

Cherrywood: services to start late 2010.

Finally, track-laying at Cherrywood

Track sections await installation on Cherrywood new viaduct

Track sections await installation on Cherrywood new viaduct

Close-up of shot above.

Close-up of shot above.

Finally, after more than 9 months of inactivity, work seems to have resumed on the Cherrywood LUAS extension, with the delivery of rails and the start of tracklaying on the bridge which has itself been complete for almost a year.

ONE IN TWELVE – Lost Location

To celebrate the 12th anniversary of the founding of the site, every day during November I’ll be bringing you one of my favourite photos from the past 12 years.

Today we look at a picture taken 11 years ago which can never be recreated – not only is the bus long gone, but the location itself has vanished forever.

Click on any picture for the fullsize version.

Bombardier KD105 parked on the now vanished ramp up to Connolly Station.

Bombardier KD105 parked on the now vanished ramp up to Connolly Station

When this site first started back in 1996, virtually the entire fleet of 366 Bombardier/GM double-deckers were still in service with Dublin Bus and Bus Eireann, and the first 4 years or so of the site recorded their steady decline and eventual scrapping.

This picture, taken in 1997, shows a typical Dublin KD – Clontarf’s KD105 – in the two-tone green livery in which they ran all of their lives, the only modification being the introduction of a thin orange band and logo when Dublin Bus devolved from CIE.

This picture, taken on a wet Friday in May, reminds me of how useful the ramp up to Connolly Station was as a location for layovers. Behind the KD are a couple of Bus Eireann vehicles, including a VC which would probably still be in service today. The location no longer exists – the ramp was levelled and removed in 2002 to make way for the new LUAS Red Line tramway station which opened in 2004.

KD105 is here resting on duty 3/27B – it had been delivered new to Clontarf in February 1982, and was one of the batch which replaced the last open platform Leyland PD3 buses at that garage.

RPA Tenders Structural surveys for LUAS A1 Citywest/Saggart branch

 

The long-awaited building of the spur from the LUAS Red Line, linking the existing line to Citywest and Saggart is coming closer, with the announcment by the Railway Procurement Agency (RPA) that they are seeking qualified consultants to perform structural survey work on properties bordering the new line.

The go ahead to construct the line depends on the finalising of a Railway Order, but work such as the surveying can go ahead in the meantime, and starting this process now will reduce the pre-construction wait after the order is granted.

Full details of the RPA tender are below.

 

Title: Luas A1_170 Structural Condition Surveys
Published by: Railway Procurement Agency
Publication Date: 24/10/2008
Application Deadline: 07/11/2008
Notice Deadline Date: 07/11/2008
Notice Deadline Time: 12:00
Notice Type: Tender
Has Documents: Yes
Abstract: RPA now seeks the services of an experienced structural engineering consultant to carry out structural condition surveys of buildings and structures along the Luas line A1 boundary.

Line A1 is a 4.2 km proposed spur to the existing Luas Red Line currently operating between Tallaght and Connolly Station. RPA completed its pre-application consultations with An Bord Pleanála in August 2007 in relation to the proposed line and has submitted a Railway Order Application in December 2007. Following the display period of the draft Railway Order Application, an Oral Hearing was held on the 11 March 2008 in An Bord Pleanála Offices, Marlborough Street and was concluded in one day. The Railway Order, if granted by An Bord Pleanála, will provide the powers necessary to construct, operate and maintain the line, subject to funding confirmation.

Luas Line A1 is the first RPA project for which a Railway Order will be sought under the new statutory framework introduced by the Planning and Development (Strategic Infrastructure) Act 2006

It is RPA’s intention to ensure that all existing buildings / structures and boundaries that may be affected by the Light Rail Works are protected from damage due to these Works. In order to determine the condition of existing buildings / structures and boundaries a condition survey will be carried out along the length of the line.

RPA now seeks the services of an experienced structural engineering consultant to carry out these structural condition surveys.

LUAS Point Extension Shots

A few pictures showing the progress of works on the LUAS tramway extension to Dublin’s Docklands and Point Depot / O2.

This work seems as if it has been going on forever, and yet wseems far less advanced than that on the Cherrywood extension, which was a much later and longer addition to the network.

All pictures taken Sunday 19th October 2008 – click on any picture for a larger version.

Tracklaying at Mayor St / Castleforbes crossing, looking east towards Point Village

Tracklaying at Mayor St / Castleforbes crossing, looking east towards Point Village

Looking west from Castleforbes, towards Spencer Dock

Looking west from Castleforbes, towards Spencer Dock

Looking east along Mayor Street, towards Spencer Dock

Looking east along Mayor Street, towards Spencer Dock

Mayor Street looking west towards IFSC

Mayor Street looking west towards IFSC

Based on the fact that trackbed construction is not complete, or even started in some areas, I would suggest it was be late in 2009 or into 2010 before services commence on this line extension.

Minister Dempsey on 2009 Transport Spending

AllAboutBuses.com)

Transport Minister Noel Dempsey (photo: AllAboutBuses.com)

GOVERNMENT PRESS RELEASE
Ministers announce €3.6 billion for Transport (Budget 2009)
  • €1.27 billion on improved Public Transport
  • €2.1 billion on National, Regional and Local Roads
  • €40 million on Road Safety
  • €35m for Aviation Sector and development of Regional Airports
  • €48 million for improved activities of Coast Guard and Maritime Safety
Ireland’s Minister for Transport, Noel Dempsey TD, today outlined plans for a €3.6 billion investment package in transport for the coming year following the publication of Budget 2009.
Speaking today Minister Dempsey said; “The €3.6 billion in this year’s transport budget underlines the Government’s continued commitment to investing in key transport infrastructure projects. A word class transport infrastructure is critical to our economy’s competitiveness. This funding will allow me to continue rolling out Transport 21 projects such as Metro North and the new Dart Interconnector, both of which will provide the backbone of an integrated public transport system for Dublin.

With this funding I aim to progress a variety of Transport 21 projects particularly in the area of public transport. Next year I also intend to continue rolling out our major interurban motorways which are now nearing completion.”
Speaking today, Minister of State at the Department of Transport Mr. Noel Ahern TD said; “A total of almost €40 million is being provided by this Government for road safety initiatives in 2009. This level of funding for the Road Safety Authority and the Medical Bureau of Road Safety will solidify the key role these organisations play in implementing the Road Safety Strategy. During the period 1997-2007 for example, we have seen deaths of our roads drop by 30% so this funding will help to augment this welcome downward trend.
The allocation of €48 million to maritime transport and safety will allow us to improve and modernise the Irish Coast Guard and continue to invest in maritime safety.”
The main transport programmes that Budget ‘09 provides for are as follows:
Public Transport – €1.27 billion
This will enable progress on a wide range of projects, including:
  • Luas extensions to Cherrywood, Docklands and Citywest;
  • Planning and enabling works on Metro North;
  • Planning works for the DART Interconnector.
  • Improved bus priority measures in Dublin and the regional cities;
  • The completion of the Middleton rail line
  • Phase 1 of the Western Rail Corridor from Ennis to Athenry;
  • The construction of the Kildare Route project
  • Phase 1 of the Navan rail line;
  • The continuation of Iarnród Éireann’s railway safety programme;
  • The start of the Dublin city centre rail re-signalling programme;
  • Continued roll-out of new railcars on the intercity routes;
Other notable projects that will be continued into 2009 are:
  • The Rural Transport Programme (now operating in every county and will provide more than million passenger journeys in 2009)
  • The Green Schools Programme (targeting 140,000 school kids by providing walking/cycling/public transport alternatives to get to school).
Roads – €2.1 billion
Key national routes will be progressed as planned, specifically:
  • The major inter urban motorway connecting Dublin with Waterford
  • The major inter urban motorway connecting Dublin with Galway
  • The major inter urban motorway connecting Dublin with Limerick
  • The major inter urban motorway connecting Dublin with Cork
  • A dual carriageway road within Northern Ireland transforming access to the North West of the Island.
  • The Atlantic Road corridor
  • The M50 upgrade will be completed.
Over €600 million is being made available to local authorities throughout the country for the upgrade and maintenance of regional and local roads.
Road Safety – €40 million
This funding will be aimed at maintaining the downward trend in road deaths. Deaths on Irish roads have dropped by 30 per cent in the period from 1997 to 2007.
Maritime Transport and Safety – €48 million
This allocation will allow us to improve and modernise the Irish Coast Guard and maritime safety to meet the needs of a 21st century maritime nation.
Regional Airports/Aviation Sector – € 35 million
The Department has made provisions to meet contractual commitments on the various regional airport projects and our share of the cost of the City of Derry Airport development.

Budget 2009 – Transport Spending

Figures released by the irish Government relating to transport spending in 2009.

TRANSPORT

Gross Expenditure for the Department of Transport in 2009 is €3,613 million, a decrease of €160 million (€6 million Current and €154 million Capital) relative to the 2008 forecast outturn. The key policy measures and adjustments associated with these resources in 2009 and later years are as follows:-

PUBLIC TRANSPORT

· capital expenditure of over €900 million is allocated to fund public transport infrastructure. This is about €70 million less than the amount made available in 2008, but it is sufficient for progress on a wide range of projects, including:

Luas extensions to Cherrywood, Docklands and Citywest

improved bus priority measures in Dublin and the regional cities

the completion of the Midleton rail line and phase 1 of the Western Rail Corridor from Ennis to Athenry

the construction of the Kildare Route project and phase 1 of the Navan rail line

the continuation of Iarnród Éireann’s railway safety programme

the start of the Dublin city centre rail re-signalling programme

continued roll-out of new railcars on the intercity routes

planning and enabling works on Metro North, and

planning works for the DART Interconnector;

· in addition, €338 million of current expenditure is provided for the operation of public transport services throughout the country. This is €6 million more than the 2008 provision.

ROADS

· capital expenditure of over €1.4 billion is being made available to the National Roads Authority. This allocation is €157 million less than in 2008, and while progress on some projects will necessarily have to slow down, key national routes will be delivered as planned, specifically:

the major inter urban roads connecting Dublin with the regional cities of Waterford, Galway, Limerick and Cork by end-2010;

the M50 upgrade;

there will also be progress on other key national routes, including the Atlantic Road

Corridor;

· over €600 million is being made available to local authorities throughout the country for the upgrade and maintenance of regional and local roads;

· capital expenditure of €10 million is provided for additional carbon reduction measures to target climate change initiatives in the transport sector;

· as a start to the Government’s commitment to part-fund a dual carriageway road within Northern Ireland transforming access to the North West of the island, a capital provision of €13.5 million is being made available in 2009 towards the planning works for this project;

OTHER

· provision for Regional Airports is reduced by €13 million to €11 million in 2009. Annual provision for capital investment in the regional airports is decided according to estimates of likely drawdowns in the year for specific projects. This can vary from year to year;

· overall, the reduced capital allocation for transport will require some rescheduling of projects. Such decisions will be taken by the Department of Transport and its agencies on a project-by-project basis, taking account of their assessment of priorities within the revised expenditure envelope;

· the impact of the reduced current allocation is being spread across a number of areas and principally involves reduced expenditure on road maintenance.

LUAS update (Cherrywood extension)

An update on the LUAS Green Line extension to Cherrywood in South County Dublin.

You can click on any photo to see the fullsize version.

Above is the new bridgework just put in place on the Brewery Road roundabout at Sandyford.

While we’re at it, let’s have a look at Brewery Road as it is now, compared to 28 years ago.

The upper of the two photos above shows the view at the top end of Brewery Road, looking towards the roundabout. Below is the exact same view taken in 1980 – note that despite the dramatic changes, the trees on the lefthand side have survived.

The lower photo shows how rural Brewery Road was in the early 1980s. The bus is a CIE bodied Leyland Atlantean “standard D”  (D396) of the type typical to the 86 route at the time (although this individual vehicle would more normally have been found on the 48A).

In those days the 86 still ran all day at a roughly half-hourly frequency, from Cabinteely to College Street.

The photo was not taken in the summer months – buses carrying the Mother’s Pride advert always had it replaced by an advert for Nimble “for summer slimness” in mid May, with Mother’s Pride returning in September.

Back to today, the above picture shows the extensive works on Ballyogan Road, the LUAS will run on the righthand side of the picture, while the greatly improved road will be on the left.

Glenamuck Road, seen from the bottom of the hill (i.e. the M50 is behind us) looking up towards the railway bridge. This road remains closed while the new bridge for LUAS is put in place, and the road itself is being totally transformed from narrow and twisty with no verge or footpath, to a much wider road with paths and cycle lanes.

Officially, Glenamuck Road is supposed to reopen to traffic on May 1st 2008, but I am not wholly convinced that the work can be finished in time. Here we see the new LUAS bridge which the road will run over.

Above the bridge, looking towards Carrickmines Cross, we can get an idea what the new road will look like when finished.

At Cherrywood, the major road crossing has now been put in place.

The end of the line, at Cherrywood Business Park, will see the elevated station named as Bride’s Glen.

Glenamuck Road & LUAS extension

A look at some of the construction work along the Cherrywood LUAS extension.

20080301-cw1.jpg

Click on any thumbnail to see fullsize picture

Work continues at a great pace on the extension of the LUAS Green Line southwards to Cherrywood.

I took a trip around the area along with Donnybrook Observer on Saturday to look at the works, particularly around Carrickmines and Tully.

The picture above shows the construction of the new road bridge over the line on Glenamuck Road, where the old Carrickmines Station was located (incidently, this is still shown as a stage point on Dublin Bus route 63, 50 years after it closed!).

The road has been closed to traffic and the 63 rerouted for some months now as not only is this new bridge being constructed, but the entire road is being remade, and on reopening will no longer be the narrow twisty lane barely wide enough for two buses to pass – it will be full width road, with cycle-lanes and wide footpaths.

The diversion of the 63 is supposed to end in April, but as shown above there is still a lot to do, so I believe it will run on quite a bit longer.

Considerable drainage work will be needed here, where the trackbed of the old Harcourt Street line has been flooded for years, and the current works are surrounded by standing water.

20080301-cw2.jpg

Above is the same location, looking in the other direction, northwards along the old rail alignment where the LUAS line will run.

20080301-cw3.jpg

The works near Tully Cross, seen above, look interesting. the picture is taken from the tiny back road that leads off Brennanstown Road, up towards the ruined church and cross. We are looking northwest, towards Carrickmines.

At this location the old railway line ran through fields which for the most part still exist, and in theory construction here should be simple. However, as can be seen, a considerable cutting and roofing over of the line is under construction – presumably developments are to take place around and over the line at this point.

20080301-glen.jpg

20080301-glen.jpg

Finally, although not part of this stage of the LUAS scheme, work has already started on clearing trackbed for the extension on from Cherrywood to Bray. This uses the former Harcourt Street alignment for a short section across the old Cherrywood Viaduct, which crosses a deep valley known as Bride’s Glen. Tree cutting and preparing of the ground commenced a month or so ago, and here we are looking (through a secure fence) out onto the top of the stone viaduct. The power lines currently running across it will have to be removed I guess.